Where will the dredged material be placed?

The dredged material — composed of sand, silt, and clay — will be deposited in a designated area of about 280 hectares. Each discharge cycle lasts roughly 15 minutes. This area contains no marine vegetation or species and has a rocky seabed located midway along the Puerto Barú navigation channel, within the same ecosystem.