Where will the navigation channel run?

Maritime access will include private pilotage and a navigation channel with an operating draft of -11 meters, 31 km in length and 100 m in width. The project is located in a natural estuary that requires a marine access route so that vessels can reach the land polygon, starting from open sea, passing through Boca Brava and Isla Muertos, and then arriving at the Chiriquí Nuevo River.